Self-sufficient water power stations for self-construction Manually propelled

Donnerstag, 21. April 2011


                                         

It would also be completely sufficient if people find a strong rope to the can 
sink basin with the feet on a slope supporting manner, slowly and would while 
simultaneously pulling up a quantity of water that a total of about 1 kg less in 
weight accounts than their own body weight!
Why, of course, first over 1.5 m above the water basin crossbeams would that 
in turn are supported by at least two vertical posts must be!
To this end, it makes sense, right at the building of the pool them on the platform 
for the Water basin and the basin then set up to build it were tuned!
Next would crossbeams on a movable part of a hook to be secured,allow it the 
time required for this load movement smooth cable movement to!
What would need more total less water, though some helpers to
Available would 
be to take turns as mentioned on the cable secured to the Uppull of the water, 
would stoop with their feet on the slopes of supporting the above!

Probably could thus rather easy - so far with less effort - and yet
But overall, a 
larger amount of water for power generation up and transported be drawn!
With best regards, Thomas Karnasch

Wednesday 20 April 2011

Self-sufficient water power stations for self-construction Manually propelled

Build your own water power station
Blueprints for a wind turbine generator
The seal is shown above prove that the copyright for Politicians-in-critical-
observation lie! Naturally, the politicians in Sub-critical observation underlying 
copyright that idea really just prior to the formation of Protect monopoly positions! 
What next for families or small businesses the unfettered use possible to protect 
this water power station with power and muscle!

Self-sufficient water power plants for developing countries to direct machine-
drive, or even for simple electricity.

A slope or a small hill could be the ideal conditions - to operate their own small 
hydroelectric plant constructed to!

A minimum height of 10m it should be possible!
Top of the slope would have a kind of balcony to be erected which, owing to the
expected load of some 1,000 liters of water, not only laid on and on Slope would be fixed.

But what in the next with a minimum of 4 stable and firm ground set out support 
from Holstämmen probably would have to be supported!
In or under the water would have a balcony with a funnel at least 20cm large 
and round drain opening watertight in the middle or at the lowest point Werede 
attached so the water can flow freely to use,10cm over the information to be 
attached flow tubes (probably at least Diameter centered), and thus more power 
to flow down to endwickelnd!

It probably makes sense together down a small water wheel (two-built bicycle 
wheels - link above) in an artificial circle in river firmly installed in order machines 
directly on the extended axis of rotation to be able to drive - about as old car fan 
belt with associated Auto-drive disks for Beispiel.Womit course also an old
Generator of a small car could be driven to generate electricity.
Build your own water wheel

Must continue on the other side of the water a long sloping terraces of at least 
50m be present, probably still in a flat appropriate not to steep state / edited 
must be prepared! What ultimately to drive the water wheel, used in water
possible, waterproof and large pneumatic tires and cars would be pulled up!

It would be conceivable to the fact that on one person as it were, draw weight rope 
mer carefully omits the water pipe to carry the dead weight sinking to facilitate the 
raising of the water car! If enough people are there, they might also have other then 
traction than men's refrain on the rope! What it is can then suitable for rapid 
re-emergence, in near a ladder secured to hire!
Build your own water wheel

Gladly, this publication without the express release of the Seal and the author - 
the prevention of the formation of monopolies - to further detailed discussion 
and justification of recognized commonprofit organizations to better use for ordinary people used be!

In one liter of water per second would be the 3600 l of water per hour!
The power P is therefore dependent on water flow Q (in m / s) and the Drop 
height h (m) and of the efficiencies η of the feed, the Water turbine, the gearbox, generator and transformer.
P = Q xhx 7/kn/m3
P = 0,1 x 100m m3/sx 7/kn/m3 = 70kW = o, oo1 m3 x 10m x 7/kn/m3 = o, 7kW
1l = In a second would be the 3600l an hour - what a performance
correspond to about 0.7 kw, what would erziehlen then at least relatively easily
should be - but actually even more!

Build your own tackle
Perhaps an alternative

With best regards, Thomas Karnasch